First -class bedroom repair

Published by Nikoloz on

First -class bedroom repair

First -class bedroom repair

Quality bedroom renovation “Full construction”
 
1 plaster walls 15400
2 Plastered walls under the wallpaper 8800
3 Installation of the ceiling of GCR 12400
4 plaster ceiling 7900
5 Leveling the floor 4300
6 installation of the window sill 2000
7 Installation of parquet board 7000
8 Ceiling painting 4300
9 Wallpaper gluing 10500
10 Door installation 3000
11 Plumbing installation. appliances 4000
12 Installation of electrical appliances 11600
 
Total 91200
Categories: services

0 Comments

Leave a Reply