It is best to use power tools for finishing stripping
Company "Husband for an hour. Kirovograd" in its activities is based on an integrated approach to the implementation of tasks of any complexity. Many years of experience in carrying out repair work and finishing of apartments allows us to guarantee the quality and timely hand over each object..
Repair in a new building

Before performing the decoration of apartments in a new building, a design project is necessarily prepared. If you refuse such documentation, The customer may encounter two problems. Primarily, The estimate calculation will contain estimates, which may not coincide with real costs. The second moment is an increase in the time to perform work, since you will need to coordinate at each stage the location of the objects, The socket, equipment and PGR.

It is also impossible to prepare a project for decorating an apartment in a new building without engineering and technical knowledge. The documentation will display the electrical wiring scheme, The location of the water supply, sewers, ventilation ducts and air conditioning systems. It is the preparation of the project that will help optimize all the costs of decorating apartments in the new house and avoid further alterations.
The complex of finishing work includes:
- Construction and installation events (The device of interior partitions, Nis, openings and PGR.);
- Apartment finish in a new building (Arrangement of partitions, walls, Laying coatings, installation of window and door structures);
- Electrical repair repair;
- Plumbing operations;
- Installation of low -current systems (Laying of cable networks and PGR.);
- Technical and copyright supervision of apartments in a new building.
The specifics of the work on the decoration in the new building

Before starting work, the premises are necessarily carried out. The building can shrink, Therefore, for decorating an apartment in a new building, you should choose special materials. Experts will perform the necessary calculations, High -strength plaster compounds will be selected, Supply reinforcement will provide.
Masters will quickly finish apartments in a new building, And customer expenses will be minimized. Our customers can count on high quality work and compressive terms.
find out, How to order an apartment finish in a new building, Having contacted the phone in Kirovograd: +380971103507 with the representative of the company.
| DESIGN PROJECT | EXPRESS | "COMFORT" | EXCLUSIVE | "Out of town" |
| Price, rub./m² | 400-800 | 800-1600 | 1600-1800 | 1800-2200 |
| Drawing up technical specifications for the project, Measurement plan of the room, Dismantling/installation plan of partitions, Furniture plan, The plan of the lamps, The location of sockets and switches, Sexual, Equipment links, Tile layout scheme, Doors installation scheme, | Ѵ | Ѵ | Ѵ | Ѵ |
| 3D object visualization, Layout of a multi-level ceiling, Warm floor layout with a temperature regulator binding | Ѵ | Ѵ | Ѵ | |
| Wall reamers (necessary), Selection of finishing materials, Furniture proposal | Ѵ | Ѵ |