Complete set of bathroom renovations




| Quality bathroom renovation “Full construction” | ||
| 1 | plaster walls | 8300 |
| 2 | Installation of boxes from GKL | 3000 |
| 3 | Leveling the floor | 1800 |
| 5 | Laying tiles on the floor | 4200 |
| 6 | Laying tiles on the walls | 21000 |
| 7 | Stretch ceiling installation | 3800 |
| 8 | Door installation | 3000 |
| 9 | Plumbing installation. appliances | 7000 |
| 10 | Installation of electrical appliances | 2700 |
| Total | 54800 | |
0 Comments