How to set the home heating system
Regarding the issue of heating system installation, which will operate on the basis of the boiler equipment, that such an installation can be carried out at any time convenient for you and time of year. If you are faced with such systems, the installation you can make yourself, If you do not have such skills, Then it is best to hire specialists. Only you should know, what before installing such a system, You will have to well score the house.

The initial stage of the installation of the system
Before installing the heating system, It is necessary to first draw up a plan. This is necessary for that, to note the location of the batteries in the premises, pipeline, Dishasis and other important details. Calculate the heat transfer of pipes, necessary taking into account the diameter and length, and then determine the total number of sections on the batteries, and it is advisable to calculate with a margin approximately 20 interest. This is necessary for that, that the effectiveness of the heating system with times will decrease.
After, how they conducted calculations and determined the number of all the necessary elements, You will need to purchase special equipment, namely:
- fittings,
- Metal -plastic pipes,
- circulation pump,
- Circulation of the coolant.
Consider the equipment in more detail.
there is a danger to the eyes and face in general due to the large amount of flying crumbs! To combine metal pipes with each other, Welding will be required. Inventor welding apparatus will help in this matter, which is easy to use. Pipes cooked by such an inverter will serve for a long time.
Universal coolant
In fact, Universal coolant is water, And it is available at any time, But it is best to use antifreeze, Namely a low measurement fluid, which is made specifically for the heating system. Most often, antifreezes use those, which are made on the basis of ethylene, or propylene glycola.
- The first is considered the most toxic substance, And it is not advisable to use it in 2-rh-contour boilers, or open heating systems.
- The second is considered less dangerous for human health, and for the environment. Besides, The fire safety of such a coolant is a prerequisite.
Sequencing
To the mandatory stages of assembly over the heating system, the following sequence must be taken into account. First of all in the walls, punch holes, in which it will be necessary to lay pipes. In this case, the holes must be made a little more diameter of the pipes themselves, so that the pipes can easily move in them. After drawing up a plan, It should be noted:
- Connecting point of the pipes,
- Connection of pipes to the boiler,
- placement of cranes, radiators and other important elements.

Batteries must be installed at a distance of three to five centimeters from the wall, And it is very important to do so, so that a crane is provided near each battery, through which the drain of the coolant will pass. As for the assembly of the heating system, then it starts with the boiler, and moves to the radiator, Finishing the end point.
After, How the assembly was completed, It is necessary to carry out tightness, and fill the heating system with water. To avoid the manifestation of air traffic jams, It is necessary to fill out through a special withdrawal from the lower point of the heating system. If you find the flow, Then you need to find out its origin. If you find damaged areas, then they need to be urgently replaced with new. If you find a leak in connecting places, then this talks about, that you did not fit the pipes well.
After correcting all the problems, You can continue testing over the heating system. After 30 minutes, You will need to turn on the boiler and carefully warm the coolant. If everything is all right, then the water can be drained and using the necessary coolant.